CKMP started construction in June 2011 on new 9600 sqft shop. It was not easy to convince Shelley to build a shop 3x's the size of their house; Carl had to bribe her with an offer to put a Turbo in her sled.

 

/files/cache/7988133a27699e4e9ddc18dd228eae3d.JPG/files/cache/1e70cac5e643f2ab382234747383b3ac.JPG/files/cache/b99b397af32eae0f76710d70c6cb86c0.jpg/files/cache/877c20d05084e2e11aeecd78dd5129dc.jpg/files/cache/d09b668f7f6bf43f86a7a9d7b41dfb41.jpg/files/cache/06a5a86e90a5db14fb33d405a0ee7243.JPG